22 FT / LOW TEMP22 ft low-temperature dishwashing trailer
- Starting price at
- $4,995 prices may vary
EMERGENCY REFRIGERATION RENTAL · FLORIDA
Review the 20 ft low-temperature refrigerated trailer rental for emergency cold storage when a commercial walk-in freezer has failed at a Florida operation. Every refrigeration call is an emergency, and this supporting unit is planned beside the dishwashing trailer when the dishroom is also affected. Emergency frozen storage when a commercial walk-in freezer has failed. The temperature label, equipment list and electrical reference below are source-reported from the client inventory and are not a verified operating range, so the unit offered is confirmed against your product in the written quote. Short-term rentals and longer leases suit hospitals, schools, hotels, caterers and restaurants. Confirm which team will receive the trailer and approve the connections. Say whether soiled and clean routes must stay separate during service. Rental periods run by the week or month, with longer leases by arrangement. Send photographs of the entrance and the existing wash area if you have them. Short outages call for trailers for rent, while a longer closure is a better fit for trailer leasing, and either way the trailer works as temporary facilities for the kitchen. Call 888-385-5513 or request a quote 24/7 to check availability and delivery.
Prices may vary · Florida · confirmed in a written quote
See all starting prices
THE CONFIGURATION
Source records for the 20 ft LT family. Temperature and equipment are source-reported. The unit offered for your dates is confirmed in the written quote, with its equipment list, utility schedule and operating conditions, before connections are arranged. Photos show equipment examples.
View the refrigerated trailer interior in the client library.
RENTAL UNITS / FLORIDA
22 FT / LOW TEMP
30 FT / CONVEYOR
38 FT / LOW TEMPStarting prices in USD for Florida daily and monthly rentals. Prices may vary and can change without notice, depending on the equipment, dates, location, delivery, setup and availability. Confirm the selected unit, rental period, delivery, setup, collection, taxes and inclusions in a written quote.
RENTAL & SETUP
These are the setup allowances to share with your facilities team and contractor. The installation schedule and any extra site work are confirmed against the unit you choose.
THE WASH SETUP / EQUIPMENT & OPERATIONS
A failed commercial walk-in freezer is an emergency, and the 20 ft low-temperature refrigerated trailer is the unit to ask about for frozen product. The client inventory labels this family with a temperature of −5°F, and records its equipment as a condensing unit, an amps panel, lighting and a NEMA plug. The −5°F figure is a source label and not a verified operating range, so the unit offered is confirmed against the conditions your product needs before it is booked. Refrigerated containers and other sizes are possible and are quoted individually. A dishwashing trailer can be quoted in the same call if the dishroom is also affected. Agree how and when the trailer will be collected once permanent washing resumes. Ask the rental team which machine configuration matches the rack volume you handle. Write down the next three meal services so the changeover can be planned around them. Keep a spare route open for deliveries so food and dishware never share a doorway at peak. Check that the delivery vehicle can turn and that the trailer can stand without blocking an exit. For on-site dishwashing during construction, compare a low-temp dishmachine, a high-temp dishmachine, a conveyor belt dishmachine and a flight-type dishmachine in a modular trailer.
For a Fort Myers hospital or school freezer failure, treat the inquiry as an emergency: say what failed, what product needs holding and when it must be moved. Mark the route between the failed walk-in, the temporary unit and the working kitchen so stock can be transferred without crossing soiled-ware routes. Ask who monitors the unit after it is connected and who responds if it alarms. Dishwashing can continue alongside, and a separate wash trailer is quoted in the same call if the dishroom is also affected. Walk the route from dish return to clean storage and mark any point where the two cross. Check that the delivery vehicle can turn and that the trailer can stand without blocking an exit. Decide who will load racks, who will unload them and where clean racks will wait. Note chemical supply, water temperature and drainage needs before choosing a layout. Ask the rental team which machine configuration matches the rack volume you handle. Agree how and when the trailer will be collected once permanent washing resumes.
The recorded electrical reference for this family is 220 V, single phase, 40 to 60 A, supplied through a NEMA plug. Have the site electrician confirm that the receptacle and circuit suit the unit offered. Ask for the unit's operating temperature range and its ambient and loading conditions, because the source temperature label does not establish them. Check the loading route, door access and the standing surface, and agree who monitors the unit and how an extension would be handled. Write down the next three meal services so the changeover can be planned around them. Keep a spare route open for deliveries so food and dishware never share a doorway at peak. Agree how and when the trailer will be collected once permanent washing resumes. Ask the rental team which machine configuration matches the rack volume you handle. Note chemical supply, water temperature and drainage needs before choosing a layout. Decide who will load racks, who will unload them and where clean racks will wait.
The main service on this site is commercial dishwashing trailer rental in Florida. If the dishroom is also out of service, ask for a low-temperature or conveyor dishwashing trailer in the same inquiry. The dishwashing starting prices on the rental pricing page apply to those trailers, while this refrigerated trailer has its own starting price on the same page. Tell the team when the failure began, when service must resume and how the equipment will be collected. Choose a receiving position with room for steps or a ramp, service connections and safe working space, and keep stock transfer clear of dirty-ware returns. Ask for the rental, delivery, setup, collection and extension terms in writing, together with the unit's equipment list. Plan five hours for setup as a reference and confirm the real schedule with the property team. A listing here does not reserve equipment or promise an arrival time. Photograph the proposed position from the kitchen door as well as from the approach. Record who signs off the connections and who is called if the machine alarms during service. Mobile dishwashing and portable dishwashing trailers are available to discuss as short-term trailer rentals or as a lease for the length of the project.
WHEN THE PROJECT NEEDS MORE
A dishroom closure sometimes forms part of a larger kitchen renovation. If cooking is affected, include a mobile kitchen rental inquiry with the wash-trailer request. Describe the menu, preparation methods, appliances that remain available and meals served during the busiest shift. A Tampa healthcare operation should identify how food moves from receiving through preparation and cooking to service, including any work still completed inside the permanent building. Choose the temporary cooking configuration through those tasks and the proposed utility connections. Plan ingredient deliveries and meal dispatch separately from soiled dish returns. A kitchen lease needs its own equipment list, site footprint and connection review. Allow five hours for kitchen setup as a planning reference, then confirm the actual schedule and responsibilities. Ask for rental, delivery, setup, collection and extension terms in writing. Discuss staffing, operating access and the return to the permanent kitchen with the people managing food production and the property. Supporting cooking equipment is selected and quoted for the actual project; a dishwashing price does not include a mobile kitchen rental. For a Gainesville campus, explain which dining services continue while the permanent cooking line is closed. The appliance discussion should follow those tasks, including preparation, cooking, holding and meal dispatch. A Tallahassee school project may instead follow a scheduled academic break; include the day food service resumes as well as the contractor's anticipated finish. Review access for ingredient deliveries and the route used by service carts. Ask which party provides each connection and what the property must prepare before the kitchen arrives. The installation plan should show the temporary kitchen alongside the washing area without using clean-rack space for food production. Include the people responsible for daily operation and the facilities schedule in the rental discussion, then request the selected equipment and responsibilities in writing. If cooking space closes as well, a mobile kitchen or a portable modular kitchen can stand on-site as temporary facilities during construction or renovation.
If a walk-in cooler or freezer breaks down during the same project, explain the emergency cold-storage need in the inquiry. Identify whether chilled or frozen storage is required, the products involved and how staff receive and retrieve stock. For an Orlando facility, the proposed position should provide a practical loading route without obstructing dish collection, clean-rack return or the contractor's working area. Request the exact proposed refrigerated configuration and its supported operating specification. Have the property team check power, placement, access and the agreed connection responsibilities. Explain the likely repair schedule and ask how a longer rental would be arranged if permanent refrigeration is delayed. The written quote should state the equipment, rental period, delivery, setup, collection and exclusions. Calls are accepted 24/7 for urgent inquiries; suitability, availability and arrival timing are reviewed for the actual property. The dishwashing starting prices on this site do not price supporting cold storage, which has its own starting prices on the rental pricing page. Coordinate stock movement with the food-service operator and identify who will review the selected unit's operating requirements before the rental is agreed. For a Miami hospitality operation, describe how frequently stock arrives and when staff need to retrieve it during service. The proposed cold-storage rental should be reviewed against that loading pattern and the selected temperature application. A Fort Myers facility arranging repairs should identify the person who can confirm usable power and the expected return of permanent refrigeration. Check how stock will move back into the building before collection, with an extension discussion if the repair schedule changes. Ask the rental team to state the equipment's operating requirements and any placement conditions. Keep the proposed connection details beside the unit description so the operator and facilities team can review the same configuration. This planning discussion concerns the actual emergency storage need and does not establish a refrigeration package price or delivery appointment. A portable walk-in cooler or freezer trailer works as temporary facilities on-site during construction, and trailer leasing covers a repair that runs long.
THE LOCAL CONTEXT
The notes below draw on public records for the area, and each one links to its source.
NOAA dates Hurricane Ian's southwest Florida landfall to September 28, 2022. For a 20 ft low-temperature refrigerated trailer, confirm usable site services after an interruption. In Fort Myers, that means discussing the actual placement area and utility readiness before a temporary wash operation is scheduled.
Orange County announced the Grand Concourse expansion groundbreaking in December 2025. For a separate Orlando project involving a 20 ft low-temperature refrigerated trailer, coordinate food-service access with the contractor's schedule. The public project is context, not a claim of customer work or an existing rental requirement.
The architect records Tallahassee's Suwannee Dining Hall renovation complete in June 2018. Similar dining work can require a 20 ft low-temperature refrigerated trailer while permanent facilities change. Use your own shutdown dates and meal-service plan; this historical example does not establish a past rental relationship.
Florida 511 provides road-condition information. For a Jacksonville delivery inquiry, also confirm the property entrance, turning area, and permissions with the site contact. Public emergency operations do not establish an approved commercial trailer route or a delivery time.
Request a quote for the selected dish trailer, Florida property, and rental dates. Ask for the billing period, minimum term, delivery, setup, collection, connection responsibilities, supplies, taxes, and exclusions. A Tampa project should compare the complete proposal alongside the monthly equipment reference and the actual delivery and setup scope.
NEARBY PLANNING
A rental job does not always stop at the city line, so each of these 17 cities has its own guide. Say whether a low-temperature or high-temperature dishmachine fits the rack volume you handle. The notes below draw on public records for schools, road projects and FEMA repair projects near each one. Short-term or long-term, a rental in Melbourne, starts with your dates. FEMA's records list “Airport Terminal Building Roof and Interior Finishes” for the City of Melbourne; ask how an extension would work if your own repair runs long. After storm damage or a renovation in Apalachicola, a commercial kitchen may need on-site dishwashing for weeks. FEMA lists “Apalachicola, City Of - Center for History, Culture, and Art 1838” for the City of Apalachicola, one example of repair work in the area. A flight-type or conveyor dishmachine layout in Midway, needs floor space, water and power at the property. FEMA lists “Mold Remediation Fire Station #1” (the City of Midway) among the area's repair projects, and your own site plan decides which layout fits. For school and care kitchens in Winter Haven, a failed machine can stop meal service quickly. Call 24/7 with the address and the next service time; Jewett Middle Academy Magnet is one example in the city.
Low-temp and high-temp dishwashing trailers sanitize differently, so ask which one suits a kitchen in Panama City Beach, before you book. School kitchens such as Surfside Middle School tend to return many trays at once. Sunrise has its own guide. School kitchens such as the one at Banyan Elementary School, in the city, cannot stop for long, and the same goes for any operation there that loses its dishroom. If a walk-in cooler or freezer fails in Port St. Joe, a refrigerated trailer inquiry can run alongside the dishwashing request. FEMA's “Port St. Joe City Hall - Building and Building Components” project for the City of Port St. Joe is one example of repair work in the city. Trailer leasing near Maitland, depends on the approach road as much as the equipment. FDOT lists managed-lane construction on I-4 in the city as active construction, so ask whether the entrance can take a trailer of your chosen length.
A walk-in freezer failure in Waldo is an emergency whatever the wash plan says. FDOT lists resurfacing on SR 24 in the city as recently completed work still under warranty, so allow extra time on the route. Madison shows up in FEMA's records for “City of Madison_Chasen Well Building_Sprayfield Pump House Roof_Fencing_Coody Well Fencing” (applicant the City of Madison). Your own outage dates, not that project, set the rental period. Where a kitchen rebuild is under way in Longwood, a mobile kitchen rental can sit beside the dishwashing trailer. FEMA's records for the City of Longwood include “Fire Station 15”. Leasing a dishwashing trailer for a site in Bradenton starts with the street address. FDOT lists resurfacing on SR 55 in the city as active construction, so check whether it touches your entrance before dates are agreed. Before a delivery to Dade City, note that FDOT lists added lanes on US 98 in the city as active construction. Ask your site contact how it affects the final approach and where the trailer can stand. A kitchen in Vernon, that loses its dishmachine can rent a trailer for a short repair or lease one through a renovation. Vernon Middle School is one of the schools in the city. Temporary facilities for a kitchen in Fort Pierce, can mean a portable dishwashing trailer parked near the existing building. St. Lucie Elementary School in the city is a reminder to ask about wash capacity at your busiest meal. Miami Springs appears in FEMA's records for a repair project called “Building and Equipment”. If a cooler or freezer fails during repair work there, emergency refrigeration needs its own inquiry alongside any dishwashing rental. A short-term rental or a longer lease in Neptune Beach starts with the same checks: entrance, power and water, and the dates. With road construction listed as active construction, add the delivery route to that list.
WHY CHOOSE US
Choose the wash configuration through the operation it must support. The individual unit pages put equipment, utility references and working-layout questions together so your team can make a more informed rental inquiry.
Share your start date and the connections that remain usable so the delivery and setup of the supporting unit can be assessed with the wash trailer.
Call 24/7 if cooking or cold storage has failed; a listing does not reserve equipment or establish arrival timing.
Bring the food-service operator and facilities contact into one inquiry so cooking, cold storage and dishwashing are planned together.
Ask which rental period and extension conditions apply to this unit, since kitchens and refrigerated trailers have their own starting prices.
Compare the unit's source-reported equipment list and utility schedule with your menu or stock before relying on the configuration.
Keep the receiving position, power supply and the route between the unit and the wash area in the placement review.
The catalog describes six equipment configurations, with photos and utility references linked to each unit page. The rental team confirms the actual equipment allocation, availability and written project responsibilities through the 24/7 contact route.
A QUESTION BEFORE YOU CALL
Yes. Each rental unit has one starting price for daily and monthly rentals. Prices may vary, so include the actual dates and ask for the minimum charge and the complete project total.
Availability is checked for your dates and property. Ask for the offered unit's equipment list, utility schedule, access arrangement and written quote before arranging connections or booking.
FLORIDA / 24/7 INQUIRIES
Tell us where the kitchen is, when the dishroom closes and how many racks you wash at your busiest meal. We will look at equipment for your dates and put the rental terms in a written quote. If a machine has just failed, call the 24/7 line.
YOUR FLORIDA RENTAL TEAM
Rental inquiries: 24 hours a day